is it possible to synch the comparison studies with each other?
Re: new java, comparison studies, ??synch
Hi,
Currently it is only possible to synchronize series within a study-tab. However, we are working on some improvements in this area and should have an upgrade shortly.
Regards,
Justin
Currently it is only possible to synchronize series within a study-tab. However, we are working on some improvements in this area and should have an upgrade shortly.
Regards,
Justin
Re: new java, comparison studies, ??synch
Hello -
You should now be able to sync with comparison studies.
1. Load multiple comparison studies into the Java viewer
a) On the worklist, select multiple comparison studies using the left side checkboxes (Or use the bottom history panel to quickly see history studies).
b) Select the down arrow on the "View" button on the bottom worklist toolbar. Select "Java Web viewer"
c) The Java viewer opens the selected studies in separate tabs.
2. Split the screen for studies.
a) Click and hold a study tab and drag either to the bottom or to the upper right to split the cases on the viewing area.
3. Synchronize Scrolling
a) Select the same series in each window
b) Select the down arrow on the "Toggle manual series synchronization" and select the study to sync with.
c) Press the "Toggle manual series synchronization" to activate the synchronized scrolling (The button should also enable on the other study automatically).
d). Click and drag to scroll the images.
See attached
You should now be able to sync with comparison studies.
1. Load multiple comparison studies into the Java viewer
a) On the worklist, select multiple comparison studies using the left side checkboxes (Or use the bottom history panel to quickly see history studies).
b) Select the down arrow on the "View" button on the bottom worklist toolbar. Select "Java Web viewer"
c) The Java viewer opens the selected studies in separate tabs.
2. Split the screen for studies.
a) Click and hold a study tab and drag either to the bottom or to the upper right to split the cases on the viewing area.
3. Synchronize Scrolling
a) Select the same series in each window
b) Select the down arrow on the "Toggle manual series synchronization" and select the study to sync with.
c) Press the "Toggle manual series synchronization" to activate the synchronized scrolling (The button should also enable on the other study automatically).
d). Click and drag to scroll the images.